Best practices in the implementation regarding DDUGJY- To determine BPL yet APL households, strong surveys ought to be conducted. The purpose of this would be to guarantee maximum coverage and streamline implementation. Alongside awareness campaigns, it should be carried out in all villages, even in difficult terrain, to ensure participation by all.
Increasing complaints are caused by intermittent power supplies following electrification. The smooth running of the Scheme is slowed down by faulty meters and failed transformers. Therefore, the risks of equipment failure should be minimized by adopting a rigorous method of limiting quality. limit method in conformity with taking a look at all equipment used, certain as like meters, transformers, cables, etc. To ensure that all complaints are addressed to the satisfaction of customers and that redress is provided within a reasonable amount of time, an effective mechanism for complaint redressal should be in place.
Best practices in water management
Drinking-Water Management- To provide adequate and safe water supply to the community of the village, a community-controlled, demand-driven, decentralized water supply program was implemented on a village level. To ensure equitable access to safe drinking water, Pani Samitis coordinates efforts with NGOs, UNICEF, WASH, and World Bank, in addition to WASMO, to enable the community to provide its members with safe drinking water. In villages covered by this project, pipes for water supply have been installed, overhead storage tanks have been built, and community participation is being ensured in managing the drinking water supply.
Conservation of water should be part of every citizen's consciousness as well as their practices. Students, faculty, and staff of higher education institutes must work constantly to make the Shakti Abhiyan a success.
There are numerous challenges related to lotus certain as water conservation, water exorcism control, watershed management, then stormwater management.
Spring Rejuvenation Best Practices- Much energy has been invested in the preservation and prevention of spring drying. Therefore, there is also growing momentum to recharge them. A few State governments as well as a number of Civil Society Organizations/ NGOs are contributing towards the development of programs to promote awareness of springs and promote capacity building to protect, develop, and manage spring sheds across the country.
In Sikkim, the Rural Management & Development Department (RM&DD) was the first to take systematic action with its Dhara Vikas Programme. Initiatives among South yet West Sikkim have been focused on the drought-prone rainshadow areas. In the State, one of the spring revival initiatives (Dhara Vikas) has been initiated with support from the Ministry of Natural Resources & Environment, an initiative that is based on building capacity, implementing of a scientific process, and community participation. In the course of developing this program, initial efforts were focused on determining the recharge area of the springs feeding the aquifers and then implementing synthetic recharge methods, such namely digging trenches in conformity with the trap the floor waft yet increasing infiltration.
Best practices in Green Energy at Railways- Numerous initiatives have been taken to conserve energy. An aggregation of over forty-seven stations was made 100% LED well suited in conformity with maintaining equal and improved Lux stages upstairs traditional fittings. Seventy-three electricity savers had been supplied because of welding transformers at workshops at the stations. Automation on the pump was once built-in through GPRS over Secunderabad Division according to maintain required cloud ranges within the overhead tanks namely well namely in imitation of keep away from overflowing over water, for that reason lowering power consumption. Other initiatives as timers because excessive masts, water coolers, pumps, optimized compressor strain settings, and temperature settings over AC units, yet voltage settings concerning limit transformers were additionally undertaken.
Electricity Generation using Pine Needles- Apart from electrical energy generation, the high energy content material relic over the biomass gasification process is briquette into revolution coal using a locally available binder. The availability of charcoal at the step has decreased the gasoline club day over the villagers by 70% then provides smoke-free surroundings for the villagers. Residue beside a hundred and twenty - kW gasifier system pleasure be sufficient according to pair the consequence gas wants regarding 100 households. People who are busy gathering dry-out needles are remunerated both with money and consequence charcoal, thereby generating earnings for native human beings yet saving the forests out of existence cut down. Avani has also developed an efficient, cheaper cinder cookstove taken totally from regionally reachable materials. Local people are educated in imitation of the generation then restore the stoves, therefore generating more livelihoods.